ROBG 425

“TEN-T: “Well-developed transportation system in the Euroregion Ruse-Giurgiu for better connectivity with TEN-T network” -eMS 425

What’s the goal?

The overall objective of the project is to modernize and upgrade the road infrastructure in Ruse and Giurgiu representing direct connections to TEN-T.

What’s the budget?

7,835,520.26 euro, out of which 6,660,192.21 euro ERDF

Target at the half of the implementation period: 40,000 euro for LB and 120,000 euro for B2.

Who is doing it?

Lead Beneficiary (LB): Territorial Administrative Unit Giurgiu

Beneficiary 2 (B2): Ruse Municipality

When is it happening?

Start date: 07.09.2018

End date: 06.03.2021

Duration: 30 months

Where is it happening?

Ruse in Bulgaria

Giurgiu in Romania

How is it going to happen?

  • procurement of specific equipment;
  • services for technical project elaboration and technical assistance;
  • construction works of roads in Giurgiu and Ruse;
  • site supervision services;
  • traffic safety measures;
  • joint strategy for optimization of the transport conditions in the CBC region;
  • common system for data base gathering and processing of traffic information;
  • information and promotional activities.

What will be the results (what’s the contribution to the Programme)?

Programme outputs: 4.3 km of roads reconstructed or upgraded;

Programme results: 2000 de people benefiting by modernized infrastructure leading to TEN-T.

Project status

The project is currently in the 9th month of implementation out of 30 months and 1 day. The proposed project activities, actions and target groups are related with the Construction modernization works in Giurgiu and Ruse (Construction works in Giurgiu - Bucuresti BD; Prieteniei RD; 1 Decembrie 98 RD and Mihai Viteazu Bld - 6 662 m and B2: Development of construction works in Ruse Municipality – bul. Lipnic - 4 300 m) and the core project actions implementation foreseen will start with the execution of both investments. The joint internal project management team on behalf of all project Beneficiaries was set up. The LB – UAT Municipality Giurgiu purchased already office equipment and a car. Within the first six months of the project implementation, the project beneficiaries have performed first Project meeting in Giurgiu on 10.10.2018 and also two Launching Conferences - on 04.12.2018 in Ruse, BG and on 23.11.2018 in Giurgiu, Ro.

In relation to the status of the investment objectives in the reporting period – the LB -Giurgiu Municipality has signed the contract for design and engineering, including technical assistance from the designer during work execution and technical verification of the designer –services. The elaborated Technical project was received by LB on 27.02.2019.

B2 – Ruse Municipality expects to sign a contract for elaboration of the technical design, construction and author supervision in very short terms.

Pictures

August 2019
Mo Tu We Th Fr Sa Su
29 30 31 1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31 1

The content of this website does not necessarily represent the official position of the European Union. The initiators of the site are the sole responsible for the information provided through the site.