Ceilings

The Monitoring Committee of the Interreg V-A Romania-Bulgaria Programme adopted the revised List of ceilings on 20.10.2020, which can be downloaded here.

For the previous ceilings of expenditures which are no longer in force - Version 4, used when drafting the full application forms under the third call for proposals, Version 5 in force since 10th of January 2018 and Version 6 in force since 24th of February 2020 click here (EXCEL/ PDF).

For the previous ceilings of expenditures which are no longer in force but were used when drafting the applications – Version 1, 2 and 3 click here (EXCEL/ PDF).

The Monitoring Committee of the Interreg V-A Romania-Bulgaria Programme adopted the revised List of ceilings on 14.02.2023, which can be downloaded here.

 

 

Pictures

October 2024
Mo Tu We Th Fr Sa Su
30 1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31 1 2 3

The content of this website does not necessarily represent the official position of the European Union. The initiators of the site are the sole responsible for the information provided through the site.